Cooperating with Comaco Germany
(The third one from right, CEO of Comaco Mr. Ferizlier)
Having advanced technology by partnership with COMACO and technology transfer from that Company to have equal tonnage and nominal capacity (guaranteed) Reducing fuel consumption and saving energy consumption up to 15% The plant is designed and the used equipment are in a way to be durable. so that, the plants that are produced about 30 years ago can still give asphalt with a capacity of nominal capacity To avoid possible problems in the site of the plants, assembling and disassembling is done in the production site. Very comfortable and easy to use and controllable by users Supply of spare parts in the shortest possible time with lowest cost (due to the inventory of spare parts in stock separately) Security and convenience for the user.